Skip links

MIL

Explore Our Solutions

Air to Air Refueling

Refueling challenges:

  • Enhance mission capabilities
  • Lower refueling operations risk
  • Faster refueling with existing equipment
  • Reduced exposure times
  • Flexible operations with either boom or drogue
  • Rapid field deployment

GS Vortex Solutions:

  • Vortex technology is proven to increase flow rates by 35-40%
  • Refueling times reduced by 30%
  • Vortex Flow Amplifier (VFA) is a plug and play line component
  • VFA has no moving parts, no energy or maintenance needs
  • VFA is compatible with both telescopic boom and drogue
  • Deployment 12-18 months
A2RM PDF View PDF Next Section

US Army Logistics Support

US Army refueling challenges:

  • Multi-vehicle simultaneous refueling
  • Faster refueling of each vehicle with existing equipment
  • Reduced exposure times
  • ;Flexible operations for all connection types
  • Rapid field deployment

GS Vortex Solutions:

  • Vortex technology is proven to increase flow rates by 35-40%
  • Refueling times reduced by 30%
  • Multi-point operations can reduce field exposure times by > 50%
  • Vortex Flow Amplifier (VFA) is a plug and play line component
  • VFA has no moving parts, no energy or maintenance needs
  • VFA is compatible with all pipe connectors
  • Rapid testing and deployment, 12-18 months
View PDF Next Section

Coastal Security Operations

DHS challenges:

  • Enhance fleet coastal security mission capabilities, range and endurance
  • High performance and reliable operations essential
  • More efficient propulsion technology needed
  • Operating cost reduction without operational compromise
  • Rapid testing and deployment within 18-24 months

GS Vortex Solutions:

  • Vortex Water-Jet Technology (VWT) is proven to increase propulsion flow rates by over 50%
  • VWT units replace outboard or inboard propeller units to deliver immediate performance gains
  • VWT has a single moving part
  • Gyroscopically balanced design
  • Enhancing performance, reliability, fuel efficiency and endurance
  • Rapid testing and deployment capable in 18-24 months
View PDF Next Section

News/Articles

Contact Us